Formation of Truck Stop, Guest House, Cafe, Spa, HGV Parking & Electrical Vehicle Charging Points at Tyn y Caeau, Margam, Port Talbot, SA13 2NW

Evans Banks Planning have been instructed by Recycling Plant & Machinery Limited to seek full planning permission for the:

Formation of a Truck Stop, (including Retention of Minor Alterations undertaken to approved plans granted Planning Permission under P2005/0449) to form a Guest House with addition of a Cafe and erection of Rear Single Storey Extension to Accommodate Spa Facilities, together with Formation of an HGV Parking Area with Electric Vehicle Charging Hub Points, Internal Access Road & Associated Infrastructure at Land at Tyn y Caeau, Margam Road, Margam, Port Talbot.

As part of the preparation of the planning application, we are now undertaking a formal pre-application consultation exercise as required by the Planning (Wales) Act 2015, and the Town & Country Planning (Development Management Procedure) (Wales) (Amendment) Order 2016 (the Order).  The draft planning application comprises of the plans, documents and statements listed below, which can be viewed by simply clicking on that item.

Hard Copies of the application documents are also available to view at Port Talbot Library, 1st Floor, Aberafan Shopping Centre, Port Talbot, Neath Port Talbot, SA13 1PB.

Commencing on the 2nd November 2022, comments and responses to the draft planning application are now invited from all parties, to be be received no later than 1st December 2022.

Should you have any queries or questions regarding the scheme, or wish to make a formal response to the documentation, please email us at info@evansbanks.com, or write to us at Evans Banks Planning Ltd, 2 Llandeilo Road, Cross Hands, Carmarthenshire, SA14 6NA.

FileSizeDownload
Application Forms187 KB Download
1112c-RPM-Margam-Design_and_Access_Statement-Oct222 MB Download
Annexe-existing_elevations83 KB Download
Annexe-existing_floor_plans90 KB Download
Bat_Tree_Report3 MB Download
Dormice_Mitigation_Report5 MB Download
Drainage Strategy Plan7 MB Download
Drainage_details_1426 KB Download
Drainage_details_2669 KB Download
Drainage_details_3450 KB Download
Drainage_Notes588 KB Download
Drainage_SUDS_details444 KB Download
Environmental Statement - Revision C - October20226 MB Download
ES - Appendix 1 - Phase_1_Ecological_Survey_Report796 KB Download
ES - Appendix 2 - Bat Survey Report Aug223 MB Download
ES - Appendix 2 - Bat Survey Report4 MB Download
ES - Appendix 3 - Landscaping_Planting_Plan_and_Specification854 KB Download
ES - Appendix 4 - Dormice_Mitigation_Report5 MB Download
ES - Appendix 5 - Reptile Survey Report2 MB Download
ES - Appendix 6 - Grassland Survey Report1 MB Download
ES - Appendix 7 - Transport_Assessment3 MB Download
ES - Appendix 7 - Transport_Assessment-Appendix_112 MB Download
ES - Appendix 7A - Transport_Environmental_Assessment2 MB Download
ES - Appendix 8 - Drainage_Strategy_Report8 MB Download
ES - Appendix 9 - Coal_Mining_Risk_Assessment14 MB Download
ES - Appendix 10 - Landscape and Visual Impact Assessment - October 20224 MB Download
ES - Appendix 11 - Development Project Risk Assessment4 MB Download
Existing_3D_elevations382 KB Download
Existing_elevations79 KB Download
Existing_floor_plans46 KB Download
Highway General Arrangement Plan162 KB Download
Location_plan540 KB Download
Proposed_3D-elevations573 KB Download
Proposed_Annexe_elevations30 KB Download
Proposed_Annexe-floor_plans40 KB Download
Proposed_Bat_Roost_plan Final118 KB Download
Proposed_elevations94 KB Download
Proposed_floor_plans89 KB Download
Site_Layout_and_Landscaping_plan3 MB Download
Topographic_survey627 KB Download
Tree_Survey_Report-Oct213 MB Download
Vehicle_swept_path_plan584 KB Download
Environmental Statement-Non-Technical Summary1 MB Download